Webinar:  May 18, 2017

Dealing with Beyond Design Basis Scenarios for Dam Spillways
 
Beyond design basis operation of a dam or spillway can be necessitated by changes in hydrology or a desire to increase the utility of an existing structure.  Hydraulic analysis of the spillway is required by regulatory agencies to ensure safe operations at the higher flows.  Please join Southern Company, Kleinschmidt, and Alden for this webinar that helps guide owners through the steps necessary to achieve effective outcomes.
 
Todd Barber
Senior Engineer, Southern Company Generation – Hydro Services                              
“The Owner’s Perspective on Spillway Safety with Beyond Design Basis Operations”
 
Paul Cyr, P.E.
Vice President, Kleinschmidt                                                      
“How Beyond Design Basis Operations affect the Part 12 Inspection”

Dan Gessler, Ph.D., P.E., D.WRE
Vice President, ALDEN                                    
“Predicting Spillway Performance for Beyond Design Basis Events”